HOTEL AND RESIDENCES AT L.A. LIVE! GENERAL CONTRACTOR: WEBCOR BUILDERS ENGINEER: MURRAY COMPANY START DATE: 08/2007 PROJECTED COMPLETION: 03/2010 CONTRACT AMOUNT: $24,856,962
DESCRIPTION OF PROJECT: 55 Story 1.8 million sq. ft. tower consisting of 3 levels of basement, a JW Marriot Hotel on levels 3 thru 21, a Ritz Carlton Hotel from levels 22 thru 26, and Ritz Carlton Residences from level 27 thru 54.
SCOPE OF WORK: We are performing the design-build plumbing for the project. To include Methane Barrier piping, sub-surface drainage piping, natural gas, domestic water, sanitary waste and vent, grease waste and vent, storm drainage and all associated plumbing equipment.
CHALLENGES: The project is challenging in that it is a steel constructed building with a very small footprint. Especially on the upper floors. Fabrication is key to staying ahead of the game. Access to the site is extremely difficult as the project is located in downtown LA. All material will need to be handled and loaded on a second shift.
|