Irvine, California
General Contractor: DPR Construction
Contract Value: $2.8M
Year Completed: 2010
Scope of Work: Process, Plumbing
Services: Design, 3D/BIM, Fab, Install
Delivery: General Contracting
Installation of new manufacturing equipment inside the existing facility to add an additional 1,089 sq. ft. for offices and 47,375 sq. ft. for manufacturing. This is a cGMP facility.
Murray Company was responsible for the following systems; RO Water, Clean-in-place Process, Process Drain, Process Air, Process Vent, WFI, Pure Water Resin Piping, Relief Vent and Acid Piping.
Site was an operating live facility. Had to be diligent in performing the work and pre-task planning so as not to disrupt the operation of the plant. Fabrication was key to the success of the project.